목차 전체
1
지하철 2호선 EAST GROUP변전설비 및 수전선로 준공도 .[10]
지하철순환선강변변전소설계도:1978.12 2
00:DRAWING LIST GANG BYUN 6
01:SUBSTATION DIAGRAM 7
02:SUBSTATION PLAN FOR GANG BYUN 8
03:MAIN CIRCUIT CABLE ROUTE FOR S/S 9
04:MAIN CIRCUIT PLAN DETAIL DREAWINGA 10
05:MAIN CIRCUIT PLAN DETAIL DREAWINGB 11
06:NEGATIVE CABLE DETAIL DRAWING(FOR 89N) 12
07:ASSEMBLY DRAWING PROTECTIVE ON THE COMPARTMENT OF H.S.C.B 13
08:WIRE DIAGRAM OF GROUNDING CONDUCTOR S/S 14
09:PIPING PLAN FOR AIR S/S 15
10:PIPING DETAIL DRAWING FOR AIR&METALLIC SUPPORTER ASSEMBLY DRAW. AIR PIPING DETAIL AT H.S.C.B 16
11:PIPING PLAN FOR CO₂&FIRE DETECTOR PLAN 17
12:PIPING DETAIL DRAWING FOR CO₂(FOR SR&Tr ROOM) 18
13:PIPING DETAIL DRAWING FOR CO₂(FOR CYLINDER ROOM)&METALLIC SUPPORTER ASSEMBLY DRAWING 19
14:ASSEMBLY DRAWING(D.S 89N FRAME FOR GANG BYUN S/S) 20
15:ASSEMBLY DRAWING(D.S 89N FRAME&L.A FRAME&D.T FRAME) 21
16:ASSEMBLY DRAWING 22
17:ASSEMBLY DRAWING(S.T FRAME FOR S/S) 23
ROUTE PLAN 24
지하철2호선성수역구분개폐소설계도:1979.6 30
00:DRAWING LIST 31
01:SINGLE LINE DIAGRAM FOR SECTION POST AT SUNG SU DONG 32
03:WIRE DIAGRAM OF GROUND SYSTEM AND PIT PLAN FOR SECTION POST 33
04:LIGHT AND RECEPTACE PLAN AND CLEAT DETAILS 34
05:DETAIL FOR FRAMES 35
06:STRUCTURAL DETAIL FOR SECTION POST AND FRAM OF SUPPORT INSULATOR 36
07:MATERIAL LIST OF FRAMES 37
08:DETAILS OF CABLE RACK 38
지하철2호선성수변전소설계도:1979.9 39
SS01:SUNG SU DONG SUBSTATION DIAGRAM 42
SS02:SUBSTATION PLAN FOR SUNG SU 43
SS03:CABLE ROUTE PLAN FOR SEONG SU DONG 44
SS04:DETAIL DRAWING OF CABLE BRACKET 45
SS05:WIRING PLAN OF GROUNDING CONDUCTOR(SEONG SU S/S) 47
SS06:PIT PLAN FOR S/S SEONG SU DONG 48
SS07:VENTILATION EQUIPMENT PLAN FOR S/S 49
SS08:LIGHTING PLAN FOR S/S 50
SS09:PLUG SOCKET PLAN FOR S/S 51
지하철2호선 상왕십리 변전소 설계도:1981 52
SW01:DRAWING LIST&LEGENT 54
SW02:SKELETON DIAGRAM 55
SW03:SUBSTATION PLAN 56
SW04:MAIN CIRCULT CABLE ROUTE PLAN 57
SW05:WIRING PLAN OF GROUNDING CONDUCTOR 58
SW06:CABLE BRACKET DETAIL DRAWING 59
SW07:VENTILATION EQUIPMENT PLAN 60
SW08:SUBSTATION FLOOR PIT PLAN 61
SW09:LIGHTING PLAN 62
SW10:PLUG SOCKET PLAN 63
지하철2호선 을지로3가 변전소 설계도:1981 64
EJ01:DRAWING LIST&LEGENT 66
EJ02:SKELETON DIAGRAM 67
EJ03:SUBSTATION PLAN 68
EJ04:MAIN CIRCULT CABLE ROUTE PLAN 69
EJ05:WIRING PLAN OF GROUNDING CONDUCTOR 70
EJ06:CABLE BRACKET DETAIL DRAWING 71
EJ07:VENTILATION EQUIPMENT PLAN 73
EJ08:S/S FLOOR PIT PLAN 74
EJ09:LIGHTING PLAN 75
EJ10:PLUG SOCKET PLAN 76
지하철제2호선 서초 수전설비 설계도:(사당서초) 89
SC01:DRAWING LIST&LEGENT 90
SC02:ASSEMBLY DRAWING 91
SC07:VENTILATION EQUIPMENT PLAN 100
SC08:PIT PLAN 102
SC09:LIGHTING PLAN 104
SC10:PLUG SOCKET PLAN 105
SC11:ASSEMBLY DRAWING 106
지하철 제2호선 1구간 수전설비 설계도:(광장강변) 109
ED003:ROUTE PLANE 111
ED013:ROUTE PLANE 1 112
ED023:ROUTE PLANE 2 113
ED033:ROUTE PLANE 3 114
ED043:ROUTE PLANE 4 115
ED053:ROUTE PLANE 5 116
ED063:MAN HOLE DETAIL DRAWING 117
ED083:“A“ TYPE MAN HOLE STEEL BAR DETAIL 2 118
ED093:MAN HOLE DETAIL DRAWING 119
ED103:“B“ TYPE MAN HOLE STEEL BAR DETAIL 1 120
ED113:“B“ TYPE MAN HOLE STEEL BAR DETAIL 2 121
ED123:DETAIL OF LYING OF NYLON PIPE&FOUNDATION 122
ED133:DETAIL FOR DISTRIBUTION LINE 123
ED143:DETAIL DRAWING FOR (GANG BYUN) S/S 124
지하철순환선신천변전소설계도:1978.12 125
00:DRAWING LIST SHIN CHUN S/S 129
01:SUBSTATION DIAGRAM 130
02:SUBSTATION PLAN FOR SHIN CHUN 131
03:MIN CIRCUIT CABLE ROUTE FOR S/S 132
04:MIN CIRCUIT CABLE ROUTE FOR PLAN DETAIL DRAWING A 133
05:MIN CIRCUIT CABLE ROUTE FOR PLAN DETAIL DRAWING B 134
06:ASSEMBLY DRAWING PROTECTIVE ON THE COMPARTMENT OF H.S.C.B 135
07:WIRING DIAGRAM OF GROUNDING CONDUCTOR S/S 136
08:PIPING PLAN FOR AIR S/S 137
09:PIPING DETAIL DRAWING FOR&METALLIC SUPPORTER ASSEMBLY DRAWING AIR PIPING DETAIL AT H.S.C.B 138
10:PIPING PLAN FOR CO₂&FIRE DETECTOR PLAN S/S 139
11:PIPING DETAIL DRAWING FOR CO₂(FOR SR Tr&D Tr ROOM) 140
12:PIPING DETAIL DRAWING FOR CO₂(FOR CO₂ CYLINDER ROOM)&METALLIC SUPPORTER ASSEMBLY DRAWING 141
13:ASSEMBLY DRAWING 142
지하철 제2호선 1구간 수전설비 설계도:(잠실신천) 164
ED00:DRAWING LIST 165
ED01:TRANSMISSION LINE DRAWING 1 166
ED02:TRANSMISSION LINE DRAWING 2 167
ED03:TRANSMISSION LINE DRAWING 3 168
ED04:TRANSMISSION LINE DRAWING 4 169
ED05:TRANSMISSION LINE DRAWING 5 170
ED06:TRANSMISSION LINE DRAWING 6 171
ED07:DETAIL OF LYING OF HUME PIPE AND FOUNDATION OF PIPE 172
ED08:A TYPE MAN HOLE DETAIL DRAWING 173
ED09:A TYPE MAN HOLE STEEL BAR DETAIL 1 174
ED10:A TYPE MAN HOLE STEEL BAR DETAIL 2 175
ED11:B TYPE MAN HOLE DETAIL DRAWING 176
ED12:B TYPE MAN HOLE STEEL BAR DETAIL 1 177
ED13:B TYPE MAN HOLE STEEL BAR DETAIL 2 178
ED14:DETAIL OF VENTILATION FOR CABLE IN COMMING 179
지하철2호선선릉변전소설계도:1979.6 180
SN01:DRAWING LIST&LEGENT 182
SN02:SKELETON DIAGRAM 183
SN03:SUBSTATION PLAN 184
SN04:MAIN CIRCULT CABLE ROUTE PLAN 185
SN05:WIRING PLAN OF GROUNDING CONDUCTOR 186
SN06:CABLE BRACKET DETAIL DRAWING 187
SN07:VENTILATION EQUIPMENT PLAN 188
SN08:S/S FLOOR PIT PLAN 189
SN09:LIGHTING PLAN 190
SN10:PLUG SOCKET PLAN 191
SUBSTATION PLAN FOR SEO CHO 192
ESC014:ROUTE PLAN 202
ESC024:ROUTE PLAN 1 203
ESC034:ROUTE PLAN 2 204
ESC044:ROUTE PLAN 3 205
ESC054:ROUTE PLAN 4 206
ESC064:ROUTE PLAN 5(EXCAVATION DETAIL OF PIPE LINE) 207
ESC074:DETAIL DRAWING(JOINT BOX&HAND HOLE) 208
ESC084:DETAIL DRAWING FOR JOINT BOX 210
ESC094:SUBSTATION PLAN 211
지하철2호선낙성대변전소설계도:1979.6 213
NS00:DRAWING LIST&LEGEND 214
NS01:SKELETON DIAGRAM 216
NS02:SUBSTATION PLAN 217
NS03:MAIN CIRCUIT CABLE ROUTE PLAN 218
NS04:WIRING PLAN OF GROUNDING CONDUCTOR 219
NS05:VENTILATION EQUIPMENT PLAN 220
NS06:PIT PLAN FOR S/S 221
NS07:LIGHTING PLAN FOR S/S 222
NS08:PLUG SOCKET PLAN FOR S/S 223
NS09:DETAIL DRAWING 224
군자동차량기지변전소증설공사:1979.6 225
G00:DRAWING LIST 228
G01:GUN JA DONG SUBSTATION DIAGRAME 229
G02:MAIN CIRCUIT CABLE ROUTE PLAN FOR GUN JA DONG S/S 230
G03:MAIN CIRCUIT CABLE ROUTE PLAN DETAIL DRAWING “B“ (FOR S/S) 231
G04:WIRING DIAGRAM OF GROUNDING CONDUCTOR(GUN JA DONG S/S) 232
G05:PIPING PLAN FOR AIR(GUN JA DONG S/S) 233
G06:ASSEMBLY DRAWING INSULATOR SUPPORT&AIR FRAME&L.A FRAME 234
군자동차량기지구분개폐소설계도:1979.6 235
C00:DRAWING LIST 236
C01:SINGLE LINE DIAGRAM FOR CAR YARD 237
C02:PLAN AND SECTION FOR CAR YARD. SWITCH ROOM 238
C03:DETAIL DRAWING 239
C04:WIRE DIAGRAM FOR GROUNDING SYSTEM AND PIT PLAN 240
C05:ASSEMBLY DRAWING FOR CABLE RACK AT CAR YARD A 241
C06:ASSEMBLY DRAWING FOR CABLE RACK AT CAR YARD B 242
C07:ASSEMBLY DRAWING D.C C.T AND 89F(DS) AND LA FRAME 243
C08:ASSEMBLY DRAWING 89N D.S FRAME 244
C09:TYPE AND ASSEMBLY DRAWING OF CLETE 245
지하철2호선동대문구분개폐소설계도:1979.6 246
D00:DRAWING LIST 247
D01:SINGLE LINE DIAGRAM FOR SECTION POST AT DONG DAE MUN 248
D02:PLAN AND SECTION FOR SECTION POST AT DONG DAE MUN 249
D03:STRUCTURAL DETAIL FOR SECTION POST AND FRAM OF SUPPORT INSULATOR 250
D04:WIRE DIAGRAM FOR GROUNDING SYSTEM AND PIT PLAN FOR SECTION POST 251
D05:DETAIL FOR FRAMES 252
D06:MATERIAL LIST OF FRAMES 253
D07:FEEDER PLACING AT DONG DAE MUN 254
D08:DETAIL DRAWING A 255
D09:DETAIL DRAWING B 256
D10:DETAIL DRAWING C 257
D11:TYPE&ASSEMBLY DRAWING OF CLEAT 258