목차 전체
1
지하철 2호선 신호보안설비 준공도 : 종합운동장-신도림-왕십리,종합사령실 .[3-1]
대운동장 ∼ 신도림 신호보안 도면목록 11
0.GRAPHICAL SYMBOLS FOR SUBWAY SIGNAL:SS220001 12
1.ROUTE LAYOUT PLAN:SS2210014 13
SAM SEONG DONG TO GANG NAM 14
GYO DAE AP TO SA DANG DONG 15
NAG SEONG DAE TO SIN LIM DONG 16
SIN DAE BANG DONG TO SIN DO RIM 17
3.LINE UP CHART OF SIGNAL ASPECT:SS2230016 18
SAM SEONG DONG TO SIN DO RIM(13) 19
SIN DO RIM TO SAM SEONG DONG(46) 24
4.RELAY RACK COMPONENTS OF RELAY ROOM:SS2240019 25
SAM SEONG DONG SIGNAL ROOM 26
YEOG SAM DONG SIGNAL ROOM 27
GYO DAE AP SIGNAL ROOM 28
SEO CHO DONG SIGNAL ROOM 29
SA DANG DONG SIGNAL ROOM 30
SEOUL DAE IP GU SIGNAL ROOM 31
SIN LIM DONG SIGNAL ROOM 32
GONG DAN SIGNAL ROOM 33
SIN DO RIM SIGNAL ROOM 34
5.CABLE PLAN:SS22500116 35
SAM SEONG DONG:(12) 36
YEOG SAM DONG:(34) 38
GYO DAE AP:(5) 40
SEO CHO DONG:(6) 41
SA DANG DONG:: (78) 42
SEOUL DAE IP GU:: (910) 44
SIN LIM DONG:(1112) 46
GONG DAN:(1314) 48
SIN DO RIM:(1516) 50
6.GENERAL ROUTE PLAN:SS2260018 52
SAM SEONG DONG:(1) 53
YEOG SAM DONG:(13) 54
GYO DAE AP 55
SEO CHO:(34) 56
SA DANG DONG:(45) 57
SEOUL DAE IP GU:(56) 58
SIN LIM DONG:(67) 59
GONG DAN:(78) 60
7.DETAILED ROUTE PLAN:SS22700123 61
BLOCK SIGNAL UNDERGROUND:(15) 62
SAM SEONG DONG:(68) 67
GYO DAE AP:(910) 70
SEOUL DAE IP GU:(1114) 72
BLOCK SIGNAL ON THE ELEVATED WAY:(1517) 76
TUNNEL:(18) 79
SIN DO RIM:(1923) 80
8.DETAIL:SS22800119 85
MAIN CABLE LADDER AND TROUGH:(14) 86
HAND HOLE:(5) 90
TUNNEL:(68) 91
STARTING SIGNAL REPEATER:(912) 94
ENTRY:(1317) 97
MAIN CABLE LADDER AND TROUGH:(18) 102
OVER GROUND:(19) 103
9.STANDARD INSTALLATION, ETC.:SS22900127 104
STANDARD FOUNDATION:(12) 105
STANDARD INSTALLATION OF IMPEDANCE BOND:(310) 107
INSTALLATION OF SIGNAL DEVICE BOX:(1112) 115
THE POSITION OF POINT MACHINE:(13) 117
INSTALLATION OF STARTING SIGNAL REPEATER:(1415) 118
INSTALLATION OF A.T.S WAY SIDE EQUIPMENT:(16) 120
INSTALLATION OF A.T.S CONTROL RELAY BOX:(17) 121
INSTALLATION OF TRAIN AND CAR STOP INDICATOR:(18) 122
INSTALLATION OF SIGNAL CABLE LADDER ARM(HANER TYPE) :(19) 123
INSTALLATION OF RAIL BOND AND INSULATED RAIL JOINT:(20) 124
INSTALLATION OF CABLE DUCT IN SIGNAL ROOM:(21) 125
CLASSIFICATION OF FIXTURE, SIGNAL LADDER, CABLE LADDER AND SIGNAL WORK RACK(2225) 126
CLASSIFICATION OF RAIL TERMINAL(TYPES):(26) 130
INDICATION LETTER:(27) 131
신도림 ∼ 왕십리 신호보안 도면목록 138
1.ROUTE LAYOUT PLAN:SS2410014 139
0.GRAPHICAL SYMBOLS FOR SUBWAY SIGNAL:SS240001 140
-1
-1
-1
-1
3.LINE UP CHART OF SIGNAL ASPECT:SS2430016 145
-1
-1
4.RELAY RACK COMPONENTS OF RELAY ROOM:SS2440018 152
-1
-1
-1
-1
-1
-1
-1
-1
5.CABLE PLAN:SS2450019 161
-1
-1
-1
-1
-1
-1
-1
-1
-1
6.GENERAL ROUTE PLAN:SS2460017 172
-1
-1
-1
-1
-1
-1
-1
7.DETAILED ROUTE PLAN:SS24700118 180
-1
-1
-1
-1
-1
-1
-1
-1
8.DETAIL:SS24800111 200
-1
-1
-1
-1
-1
-1
9.STANDARD INSTALLATION, ETC:SS24900120 212
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
종합사령실 도면목록 235
SITE OF OPERATION ROOM 236
SITE OF EQUIPMENTS ROOM 237
COMPOSITION OF DATA COMPILER COMPUTER SYSTEM 238
COMPOSITION OF CONSOLE CONTROL COMPUTER SYSTEM 239
CABLE PLAN 240