목차 전체
1
지하철 2호선 신호보안설비 준공도 :왕십리-성수, 차량기지선, 성수-종합운동장역 .[3-2]
왕십리∼성구간전기설비신호보안 INDEX 7
0.GRAPHICAL SYMBOLS FOR SUBWAY SIGNAL : SS230001 8
1.ROUTE LAYOUT PLAN : SS231001 9
3.LINE UP CHART OF SIGNAL ASPECT : SS233001 10
4.RELAY RACK COMPONENTS OF RELAY ROOM : SS234001 11
5.CABLE PLAN : SS2350012 12
WANG SIB RI 12
SEONG SU DONG 14
6.GENERAL ROUTE PLAN : SS236001 15
7.DETAILED ROUTE PLAN : SS2370016 16
UNDERGROUND 16
TUNNEL 19
ON THE ELEVATED WAY 21
8.DETAIL : SS2380014 22
CABLE LADDER 22
ENTRY 23
SIGNAL REPEATER 24
UNDERGROUND∼GROUND 25
9.STANDARD INSTALLATION,etc.: SS23900118 26
STANDARD FOUNDATION OF IMPEDANCE BOND 26
STANDARD FOUNDATION OF ON THE ELEVATED WAY 27
INSTALLATION OF SIGNAL DEVICE BOX 28
STANDARD INSTALLATION OF IMPEDANCE BOND(DC750A) 29
STANDARD INSTALLATION OF IMPEDANCE BOND(DC1000A) 31
INSTALLATION OF SIGNAL DEVICE BOX(TYPE 1) 33
INSTALLATION OF STARTING SIGNAL REPEATER(FOR UNDERGROUND) 34
INSTALLATION OF STARTING SIGNAL REPEATER(FOR THE ELEVATED WAY) 35
INSTALLATION OF A.T.S CONTROL RELAY BOX 36
INSTALLATION OF TRAIN AND CAR STOP INDICATOR 37
INSTALLATION OF SIGNAL CABLE LADDER ARM(HANGER TYPE) 38
CLASSIFICATION OF ANGLE AND FIXTURE OF SIGNAL CASE DEVICE BOX 39
CLASSIFICATION OF SIGNAL LADDER 40
CLASSIFICATION OF CABLE LADDER(TYPECURVATURE,UP AND DOWN) 41
CLASSIFICATION OF SIGNAL WORK RACK 42
INSTALLATION OF CABLE DUCT IN SIGNAL ROOM 43
INSTALLATION OF RAIL BOND AND INSULATED RAIL JOINT 44
성수∼종합운동장설비신호보안 INDEX 55
1.ROUTE LAYOUT PLAN : SS21100112 56
CAR DEPOT ROUTE LAYOUT PLAN (111) 58
2.INTERLOCKING PLAN : SS2120018 70
3.LINEUP CHART OF SIGNAL ASPECT : SS2130014 71
SIN DAP TO DAE UN DONG JANG AP (12) 72
DAE UN DONG JANG AP TO SIN DAP (12) 74
4.RELAY RACK COMPONENTS OF RELAY ROOM : SS2140017 76
CAR DEPOT (12) 77
SEONG SU DONG 79
GU EUI DONG 80
SEONG NAE 81
SIN CHEON 82
DAE UN DONG JANG AP 83
INSTALLATION OF CABLE DUCT IN SIGNAL ROOM 84
5.CABLE PLAN : SS2150017 85
CAR DEPOT 1 86
CABLE PLAN(23),SEONG SU 88
CABLE PLAN(41,2),GU EUI 90
CABLE PLAN(51,2),SEONG NAE 92
CABLE PLAN(6),SIN CHEON 94
CABLE PLAN(7),DAE UN DONG JANG AP 95
6.GENERAL ROUTE PLAN : SS2160015 96
CAR GENERAL ROUTE SECTION PLAN 97
GENERAL ROUTE PLAN 1,MAIN CONCRETE THROUGH AND CABLE LADDER FOR CAR DEPOT 98
GENERAL ROUTE PLAN 99
GENERAL ROUTE PLAN 100
GENERAL ROUTE PLAN 101
7.DETAILED ROUTE PLAN : SS21700134 102
8. DETAIL : SS 232
DETAILED ROUTE PLAN(115),CAR DEPOT 103
DEAILED ROUTE PLAN TYPE (15),ON THE ELEVATED WAY (1619) 122
DEAILED ROUTE PLAN(2023),SEONG SU DONG 126
DEAILED ROUTE PLAN(2427),UNDERGROUND 131
CAR DEPOT INTERLOCKING PLAN (17) 140
REALY RACK COMPONETS OF RELAY ROOM 141
CABLE PLAN CAR DEPOT (12) 142
9. STANDARD INSTALLATION. ETC : SS 195
10.QUANTITY LIST : SS211000113 166
TRACK CIRCUIT (67) 167
SIGNAL EQUIPMENT (45) 169
A.T.S WAY 171
SIGNAL DEVICE BOX 172
CABLE LADDER AND TROUGH 220